Provide environmental construction monitoring services to meet CEQA and NEPA regulatory requirements and comply with required environmental mitigation measures in reconstruction project.
Location: North America
Utilize in Situ Bioreactor (ISBR) systems at closed hazardous waste management site in to evaluate remediation of soil impacted with chlorinated hydrocarbons.
Investigate borehole and monitoring well installation, Cone-Penetrometer-Testing (CPT) and Membrane Interface Probe (MIP) surveys to characterize nature and extent of VOCs.
Oversee comprehensive waste management programs at multiple locations for aerospace firm.
Provide regulatory and technical consulting services to evaluate presence of PFAS chemicals on airport property.
Verify California Municipal Utility District’s GHG emissions reports to The Climate Registry and the California Air Resources Board.
Complete pilot testing and develop Remedial Action Plan (RAP) specifying use of combination air sparging and soil vapor extraction system to treat petroleum hydrocarbon plume.
Perform system-wide evaluation of secondary containment structures and develop three-part program to improve containment and achieve compliance with SPCC regulations for Class I railroad.
Perform remedial alternatives assessment to identify additional remedial measures within source area.
Conduct intensive field survey and prepare Cultural and Paleontological Resources Reports for solar farm project.